Coal-mining complex overfulfils daily production plans

Workers of the Kujang Area Coal-mining Complex have overfulfilled their daily production plans.

The complex gives priority to prospecting and conducts a vigorous campaign for high-speed tunnelling to increase coal fields and pays primary attention to the work of increasing coal production by introducing advanced mining methods and machinery.

Meanwhile, different coal mines of the complex pushed ahead with preliminary tunnelling to secure coal pits with good prospects and raised the operating rate of pit equipment to produce more coal than planned.

 

KCNA-THE PYONGYANG TIMES

URL:http://www.pyongyangtimes.com.kp/?bbs=40213